JETFLO
CASE STUDY

Client:
Southco Fasteners
Project:
Climate control solution for new warehouse distribution facility
Project Time Frame:
6 weeks
Special Requirements:
Rapid heat-up, free cooling, low energy consumption
Design Brief:
When Southco Fasteners were drawing up their plans for a new 140m x 35m assembly and warehouse distribution facility, ATS were drafted in to design and install a total climate solution.

With its 8m height, the main challenge was to maintain stable temperatures throughout the building whilst keeping energy consumption to the minimum.

Rapid heat-up and free cooling were key requirements of this brief, so JETFLO air distribution provided the perfect solution. It’s ideally suited to the demands of a large space.

Year round control is provided by a fully automated control system that is adjusted to match local environmental needs. An indirect gas fired heater with JETFLO air distribution was installed to ensure temperature uniformity.

ATS delivered a bespoke climate control system within just a few weeks. The consultative approach was valued and appreciated by Southco and the project was delivered on time and on budget.

Click here for JETFLO profile.

climate control specialist


Air Technology Systems Ltd
Forbes House, 30 Harris Business Park, Hanbury Road, Stoke Prior, Bromsgrove B60 4BD
Tel: 01527 833383 Fax: 01527 833385

 

ats 100% total climate control guaranteed JETFLO INDUCTION PUREFLO DISPLACEMENT INDUSTRIAL VENTILATION ODOUR CONTROL